Performance

Measured performance. Clearly explained.

Patinas is developed and evaluated using defined engineering tests. Our published results show how the technology performed under specific conditions, what was recovered, and where limitations remain.

What has been tested

Controlled conditions, and real hardware.

Network impairment

Tests run under defined profiles: bursts of loss, reordering and gaps of seconds, rather than a clean laboratory link.

Recovery

Each run records what was recovered from information already sent, what needed retransmission, and what could not be recovered.

Real camera hardware

At least one test carried a live camera's own stream through the path, rather than a synthetic video source.

What the tests showed

Three results, and the scope of each.

99.95%

What was measured: the proportion of video data delivered in a controlled pit-network impairment profile.

What it does not prove: uptime, or performance on a different network. A test result, not a service level.

CL-2026-001

250 ms

What was measured: 95th-percentile transport latency under a bounded-impairment test.

What it does not prove: total camera-to-screen delay, or a maximum. The tail still exists.

CL-2026-002

0 re-dials

What was measured: mid-run connection restarts under the storm profile, where they previously occurred.

What it does not prove: seamless roaming, or video through a complete outage.

CL-2026-004

The public table carries the full set, including the conditions behind each figure and the rows we have not cleared for release.

What is ready for use

Maturity is per capability, not per product.

Established

Some core algorithms and integration interfaces have reached the project's Production maturity level.

Preview

The network transport and the principal video integration components are functional and tested, but still require deployment-specific evaluation.

Experimental

Some additional integrations remain under development and are not ready for production commitments.

Which capabilities are ready, in Preview or experimental →

Failures are published too

We document failures as well as successes.

One severe network test initially failed its acceptance criteria. The issue was corrected and the test repeated. The original failure remains part of the published engineering record rather than being removed.

CL-2026-007 in the public table →

What this does not mean

No guarantee travels with a figure.

  • A delivery ratio is not an availability promise.
  • A p95 latency is not a maximum.
  • A bench camera is not a customer deployment.
  • No result predicts a network we have not tested.

Suitability is assessed against your environment, not this page.